Saturday, 2 March 2013

Day 144 - Sparkies

Day 144 and the electrician is in over these three days to put in all the outlets and wire in appliances etc.  Bulkhead lights on the outside.  (We're almost in the house, judging from the photo)


Outlets!  Power sockets!  Ethernet!  TV cable!  (Not that we will use the TV cable, but it seemed a good idea to wire it into the house during the build, in case we ever need it or sell the place.)



Ethernet, TV cable, and eight electrical outlets per room, at least two on each wall.



Recessed lighting in living room/kitchen/halls etc.



Bathroom.  Still need to pick up the heated towel rails for these, though.


Ensuite.


 Bathroom lighting, vents, and heat lamps.



 Ceiling fans in the bedrooms!  Oh how I've missed ceiling fans over the hot summers here.


The sparky is finishing up today, and the concrete is being ground and sealed in preparation for the wood flooring to go down next week.  With a bit of luck we'll have handover in two weeks!

No comments:

Post a Comment