Saturday, 27 October 2012

Day 19 - RibRaft Installation & Heavy Metal

At last, the driveway has been metaled!  So we were able to drive down it right up to what will be the garage door!

In addition, the layout for the RibRaft foundation has been put into place, pretty much all done aside from the pouring of the concrete.

  From up on the pile of topsoil, you can get a good view of the driveway loop and foundation.

 Good overview of the foundation.  I'll have to start getting regular shots from up there as well, in future.
 And finally a closeup of the RibRaft foundation thus far.




No comments:

Post a Comment