Conveniently, the 'lawn' had also been mowed.
Here is the view of the graveled entrance as seen from across the street. And a view down the drive.
And here is the foundation of the house, at last!
As you can see, piping has also been put in place for both the rainwater collection tank and wastewater removal. Below are the drainage fields for the septic and other wastewater.
While we were viewing, the first load of wood for the framing arrived:
The drainage field and piping will be filled in today after their official inspection, and the remainder of the framing arrives Mon-Tues for assembly!
And then we left for the time being, which looked like this: