Saturday, 10 November 2012

Day 33 - We've been framed!

Lots of things since the last update.  Most obviously, the frames have gone up!

 It's beginning to have something of a shape to it.
 

 In the immediate foreground is the mostly re-filled drainage field.  Near the digger is the septic tank, but there's not much to see since it's in ground, just not yet filled over.

The above view is from the front of the house.  Garage on the right side, bedroom  and then dining room to the left.

Here is the view from inside the master bedroom.  Left is the closet (we can hang clothes up properly again!), the ensuite dead ahead, and to the right is the door to the living room.

Once again the giant pile of topsiol provides an excellent vantage point.


Here is a view from south of the house, looking towards the back of it.  Note the water tank on the left.  House water will be primarily rainwater from the roof, though we'll be running pipe from the bore at the corner of the property for most irrigation and garden use.

And there's the wee tank as seen from above.

And one last tank photo.  Unfortunately with just bare frames, photos of the house are very much a jumble.  It's fine in person with depth perception to help, but on a 2 dimensional photo it's a bit of a mess.  Looks good when you're in it, though!