Saturday, 2 February 2013

Day 117 - Plastered

They've been hard at work plastering the walls this past week, and interior painting is expected to happen this coming week.  The same contractor is plastering and painting both interior and exterior, hence not a lot of painting been done lately on the outside as he's been busy with the interior walls.

A lot of the inside looks pretty similar at the moment, but here is the living room as it stands.

Tub has been put in place, showering being installed in the next week or so, and bathroom tiling to go in about two weeks from now.
 Dining room with hall down to garage on left.
 View from living room towards kitchen and garage hallway.
 Kitchen.
 Holes for lighting was cut last week as well, here is the kitchen ceiling.

 Garage.
 Master bedroom.
 View of backyard through office/computer room window.  Lively crop of thistles is thriving on the disturbed ground where the drainage field went in.
 A flock of ten or so Pukekos were wandering through the tall grass just behind the house.

All in all, the builders are expecting the house to be finished by the end of February!